Americold
Dunkirk, New York
- 136,000 sf -20°F freezer with 50 ft clear height
- 480,000 gallon fire protection water tank
- Temperature-Controlled Facility
- 20-acre site
- 11,000 sf repack dock
- 25,000 pallet positions
- 34 dock positions
Construction of a 181,000 sf temperature-controlled facility for Americold in Dunkirk, NY. The building sits on a 20-acre site that required wetland delineation and features a two-story office/support space area and a 136,000 sf -20F freezer with 50 ft clear height. The project was designed to be capable of adding a rail dock at the rear of the building. Additionally, the facility boasts a 480,000 gallon fire protection water storage tank and associated diesel fire pump.
Building for the Future & LEED
This fast-tracked project was designed to accommodate a future rail dock and included a -20°F section with processing in the dock area. Harsh winter weather and deep snow added to the construction challenges. The LEED Silver certification was achieved with the help of United Insulated Structures and ALTA Refrigeration, who collaborated on the energy-efficient design. Unique features also included wetland delineation and a design shift that relocated the pump house into the main building for efficiency and environmental compliance.
Self-Perform
Our self-perform group completed the installation of insulated metal wall panels, floor insulation and miscellaneous carpentry items, as well as refrigerated doors for the facility.