Central Storage & Warehouse

Project Description

Provide all design, engineering and construction required for the “Turn-Key” development of a new 74,500 square foot Cold Storage Distribution Warehouse. Site and building design had to incorporate expansion requirements for 150,000 square feet of future additional warehouse.

The project included:

58,000 sq. ft. -20°F freezer with 32’-0” clearance
8,000 sq. ft. , 40’-0” deep, +40°F loading dock with overhead pallet storage and five automatic dock levelors with truck restraints
8,000 sq. ft. masonry office building which includes an employee welfare area and all associated interior finishes

UISC acquired and installed a complete structural steel storage rack system, which contained 8,400 pallet storage positions.